In this article, I covered the Standard Deliverables of Instrumentation prepared by EPC companies to execute EPC projects.
Introduction
If you are an instrumentation engineer and working in EPC companies or want to work in EPC companies then this article will really help you.
The cost of the EPC projects is estimated in four phases Feasibility, Conceptual, FEED, and detailed Design respectively.
During these four phases, there are multiple documents that need to be prepared by individual engineering disciplines.
SR NO. | PROJECT COST ESTIMATION phases |
---|---|
1 | FEASIBILITY STUDY |
2 | CONCEPTUAL STUDY |
3 | BASIC / FULL FEED |
4 | DETAILED DESIGN |
In this article, I am covering the Standard Deliverables of Instrumentation which is prepared by C&I Discipline.
This may differ from industry to industry but more-or-less these documents are the same.
if you want to know what documents have to be prepared by Other disciplines like (Process, Civil, Mechanical, Piping, Electrical, HSE, Material, and Quality) then pls comment.
1. FEASIBILITY STUDY
A feasibility study defines the technical and economical feasibility of the project and it is a very important step.
without economic benefits, there are no projects that will work.
The control and Instrumentation department prepared the listed documents during the feasibility study.
SR NO. | I & C DOCUMENTS DURING THE FEASIBILITY STUDY |
---|---|
1 | Control & Instrumentation Philosophy |
2 | Pipeline Leak Detection Philosophy |
3 | Metering Philosophy |
4 | Telecomms Philosophy |
5 | Control and Safety System Topology Diagram |
6 | Telecoms Block Diagram |
2. CONCEPTUAL STUDY
The conceptual study covers the concept of facilities with probability and execution risk in line with client requirements and business plan.
This study became the base of FEED(Front-end engineering design) which is the next step after the conceptual study.
But in this phase, the deliverable of instrumentation is the same as the Feasibility study with some extra details.
SR NO. | I & C DOCUMENTS DURING THE CONCEPTUAL STUDY |
---|---|
1 | Instrumentation & Control System Philosophy |
2 | Pipeline Leak Detection Philosophy |
3 | Metering Philosophy |
4 | Telecomms Philosophy |
5 | Control and Safety System Topology Diagram |
6 | Overall Telecommunication System Block Diagram |
3. BASIC FEED (FRONT END ENGINEERING DESIGN)
In the FEED phase, the selected concept from CONCEPTUAL STUDY to the level where a section of the final project will be made. And in the Basic FEED budget quotes for equipment and bulks are utilized.
SR NO. | I & C DOCUMENTS DURING THE BASIC FEED STUDY |
---|---|
1 | EDS Philosophy |
2 | Metering Philosophy |
3 | Telecomms Philosophy |
4 | PLMS Philosophy |
5 | Telecommunication System Functional Specifications |
6 | Integrated Control & Safety System (ICSS) Specification |
7 | General Instrumentation Specification |
8 | Package Equipment Specification |
9 | Control Panel Specification |
10 | Metering Specification |
11 | Control and Safety System Topology Diagram |
12 | Typical Telecomms Room Layout |
13 | Shutdown Cause & Effect Charts |
14 | ICSS Database including I/O Sched & Index |
15 | Prelim Inst Cable Block Diagram |
16 | Control Room Layout Drawing |
17 | Overall Telecommunication System Block Diagram |
18 | Instrument Data Sheets |
4. FULL FEED (FRONT END ENGINEERING DESIGN)
The full FEED Phase covers all the budget quotes for types of equipment and bulks.
SR NO. | I & C DOCUMENTS DURING THE BASIC FEED STUDY |
---|---|
1 | EDS Philosophy |
2 | Metering Philosophy |
3 | Telecomms Philosophy |
4 | PLMS Philosophy |
5 | Telecommunication System Functional Specifications |
6 | Integrated Control & Safety System (ICSS) Specification |
7 | General Instrumentation Specification |
8 | Package Equipment Specification |
9 | Control Panel Specification |
10 | Metering Specification |
11 | Instrument Data Sheets |
12 | Prelim Inst Cable Schedule |
13 | Control and Safety System Topology Diagram |
14 | Shutdown Cause & Effect Charts |
15 | ICSS Database including I/O Sched & Index |
16 | Prelim Inst Cable Block Diagram |
17 | Control Room Layout Drawing |
18 | Overall Telecommunication System Block Diagram |
19 | Bulk Instrument MTO |
20 | Technical Requisition for LLI’s |
4. DETAILED DESIGN
Based on Full FEED in the Detail Design Phase, the development of the project is on such a level that final procurement and construction will start.
SR NO. | I & C DOCUMENTS DURING THE DETAILED DESIGN |
---|---|
1 | Instrument Design Basis/Philosophy |
2 | ICSS Specification |
3 | Control Panel Specification |
4 | Fiscal Metering Specification |
5 | Package Instrument Specification |
6 | General Instrument Specification |
7 | Bulk Materials Specification |
8 | Instrument Installation Specification |
9 | Fire Alarm System Specification |
10 | Fire Alarm System Data Sheet |
11 | Instrument Data Sheets |
12 | Technical Requisitions |
13 | Cause & Effect Charts – Shutdown |
14 | Cause & Effect Charts – F&G |
15 | Logic Diagrams – PCS |
16 | Control Narratives & Sequence Descriptions |
17 | Control Narratives |
18 | ICSS Topology Diagram |
19 | Instrument Index |
20 | DCS I/O Schedule |
21 | ESD I/O Schedule |
22 | F&G I/O Schedule |
23 | Sizing Calculations – Control Valves |
24 | Sizing Calculations – Relief Valves |
25 | Sizing Calculations – Flowmeters |
26 | Intrinsic Safety Calculations |
27 | Instrument Air Consumption Calculations |
28 | Electrical Power Consumption Calculations |
29 | Control Room Layout Drawings |
30 | Equipment Room Layout Drawings |
31 | Instrument Location Drawings |
32 | Cable/Tray Routing Drawings |
33 | F&G Detector Layout Drawings |
35 | Interconnection/Termination Drawings |
36 | Cable Block Diagrams |
37 | Cable Schedule |
38 | Cable Drum Schedule |
39 | Junction Box Schedule |
40 | Instrument Installation Drawings |
41 | Process Hook-up Drawings |
42 | Pneumatic Hook-up Drawings |
43 | Instrument Loop Diagrams |
44 | Demolition Study/Drawings |
45 | ICSS Graphic Sketches |
46 | Instrument – Electrical Interface Drawing |
47 | Instrument – Piping Interface Drawing |
48 | Instrument Earthing Philosophy Drawing |
49 | Label Schedules |
50 | Tie-in Lists |
51 | Bulk Material Take-off |
SR NO. | TELECOM DOCUMENTS DURING THE DETAILED DESIGN |
---|---|
1 | Telecommunication Design Baisis / Philosophy |
2 | Telecommunication Systems Functional Specifications |
3 | Typical Telecommunication Room Layout |
4 | Overall Telecommunication System Block Diagram |
5 | Telecoms Equipment Location Drawings |
6 | Telecoms Cable/Tray Routing Drawings |
7 | Telecoms Interconnection /Termination Drawings |
8 | Telecoms Cable Schedule |
9 | Cable Drum Schedule |
10 | Telecoms Tagging Index |
11 | Telecoms Installation Drawings |
12 | Electrical Interface Drawing |
13 | Piping Interface Drawing |
14 | Telecoms Earthing Philosophy Drawing |
15 | Fire Alarm & CCTV Layout |
16 | Fire Alarm Block Diagram |
17 | CCTV Block Diagram |
EndNote
I hope these resources and Knowledge will become helpful to you in the future. You can also give your input through the comment section.
And I continue to make this type of resource and knowledge-sharing posts on my website.
if you want to write an article on the website, please contact us by this mail id: [email protected]
If you like this article, you can also like my previous article on Temperature measurement without thermowell.
And you can also follow our LinkedIn group which is specially made for sharing information related to Industrial Automation and Instrumentation.
[…] Standard Deliverables of Instrumentation for EPC Projects […]